Home » 2016 » April » 6 » kitchen doors replacement
6:26 PM
kitchen doors replacement





#Kitchen Renovations AU - Dream Doors Kitchens Australia

Dream Doors Kitchens for Kitchen Renovations is Australia’s trusted kitchen company. The business draws on experience gained over the last 14 years in markets around the world. Our kitchen renovation service results in an amazing kitchen facelift whilst saving $1,000's compared to installing an entirely new kitchen.

Renovation Ideas

Keep the structure, add to the rest

The idea behind a kitchen renovation is to make as much use of the kitchen hardware that you already have, such as the kitchen units, electrical, plumbing and waste connections, whilst adding new benchtops, door fronts, drawers etc to make a fabulous new kitchen.

Small layout changes

You may wish to make small changes to the layout of your kitchen, such as adding a new unit, or moving the placement of a large appliance.  This is still possible when we renovate a kitchen.  You only need to go down the entirely new kitchen route if you wish to completely change the layout of your kitchen.

Selection of products to fit existing units

Our entire range of benchtops, door fronts, handles, splash backs, and hardware such as pull-out baskets, bins, pull-out pantry unit etc can all be fitted into existing kitchen units, and repairs can be made to units that are slightly worn. If necessary, old units can be replaced.

Request a Brochure to view our entire range, or view our:

Renovation Process

The first step in the renovation process is for you to discuss your ideas with us, either by asking some questions via our enquiry form, or phone number, or to arrange for one of our kitchen designers to come and visit you in your home.

The next step would be for us to come and measure up your kitchen and for us to show you samples of the various benchtops, door fronts, etc and at this stage you can also choose colours and finishes

We will then produce you a full quotation, which is something we like to do with you, rather than simply send out in the post. The reason for this is because we operate an entirely open pricing policy, so you can see exactly what each item costs and looks like.  This can be really helpful, because you might decide to include or remove items partly based on the price and partly based on the samples.

4. Schedule Work

Once you are happy with the quote, we can schedule in when the work can be done.  There is typically a 2-4 week lead time during which all items are made to measure for your kitchen.

4. Installation

The installation itself typically takes a day, sometimes a little more depending on the size and complexity of the work involved.

Once installed, the kitchen is ready for you to enjoy!




Views: 218 | Added by: iviangame | Tags: au, Renovations, Dream, Kitchens, Doors, Australia, kitchen | Rating: 0.0/0
Total comments: 0
avatar